A procedure for multi-criteria selection of building assemblies K Nassar, W Thabet, Y Beliveau Automation in Construction 12 (5), 543-560, 2003 | 104 | 2003 |
Developing a complexity measure for project schedules KM Nassar, MY Hegab Journal of construction engineering and management 132 (6), 554-561, 2006 | 102 | 2006 |
Slum development using zero waste concepts: construction waste case study SM Elgizawy, SM El-Haggar, K Nassar Procedia Engineering 145, 1306-1313, 2016 | 71 | 2016 |
Using Weibull analysis for evaluation of cost and schedule performance KM Nassar, HG Gunnarsson, MY Hegab Journal of Construction Engineering and Management 131 (12), 1257-1262, 2005 | 71 | 2005 |
Genetic algorithms for ceiling form optimization in response to daylight levels T Rakha, K Nassar Renewable energy 36 (9), 2348-2356, 2011 | 66 | 2011 |
Evaluating cost overruns of asphalt paving project using statistical process control methods KM Nassar, WM Nassar, MY Hegab Journal of construction engineering and management 131 (11), 1173-1178, 2005 | 65 | 2005 |
Algorithms for automated deduction of topological information TH Nguyen, AA Oloufa, K Nassar Automation in construction 14 (1), 59-70, 2005 | 60 | 2005 |
Evolutionary optimization of resource allocation in repetitive construction schedules K Nassar Journal of Information Technology in Construction (ITcon) 10 (18), 265-273, 2011 | 49 | 2011 |
Prequalification of Egyptian construction contractors using fuzzy‐AHP models O Hosny, K Nassar, Y Esmail Engineering, Construction and Architectural Management, 2013 | 48 | 2013 |
Assessing building information modeling estimating techniques using data from the classroom K Nassar Journal of Professional Issues in Engineering Education and Practice 138 (3 …, 2012 | 46 | 2012 |
Simulation gaming in construction: ER, the equipment replacement game K Nassar Journal of Construction Education 7 (1), 16-30, 2002 | 46 | 2002 |
Layout optimization of construction site facilities with dynamic freeform geometric representations I Abotaleb, K Nassar, O Hosny Automation in Construction 66, 15-28, 2016 | 45 | 2016 |
Approaching sustainability of construction and demolition waste using zero waste concept SM Elgizawy, SM El-Haggar, K Nassar Low carbon economy 7 (1), 1-11, 2016 | 41 | 2016 |
Fuzzy clustering validity for contractor performance evaluation: Application to UAE contractors K Nassar, O Hosny Automation in Construction 31, 158-168, 2013 | 41 | 2013 |
Assessing the spatial and temporal variability of fine particulate matter components in Israeli, Jordanian, and Palestinian cities JA Sarnat, T Moise, J Shpund, Y Liu, JE Pachon, R Qasrawi, Z Abdeen, ... Atmospheric Environment 44 (20), 2383-2392, 2010 | 41 | 2010 |
Sign visibility for pedestrians assessed with agent-based simulation K Nassar Transportation research record 2264 (1), 18-26, 2011 | 39 | 2011 |
Building assembly detailing using constraint-based modeling K Nassar, W Thabet, Y Beliveau Automation in Construction 12 (4), 365-379, 2003 | 35 | 2003 |
Seasonal and spatial trends in the sources of fine particle organic carbon in Israel, Jordan, and Palestine E von Schneidemesser, J Zhou, EA Stone, JJ Schauer, R Qasrawi, ... Atmospheric Environment 44 (30), 3669-3678, 2010 | 34 | 2010 |
Green envelop impact on reducing air temperature and enhancing outdoor thermal comfort in arid climates S Wahba, B Kamil, K Nassar, A Abdelsalam Civil Engineering Journal 5 (5), 1124-1135, 2019 | 33 | 2019 |
Solving the least-cost route cut and fill sequencing problem using particle swarm K Nassar, O Hosny Journal of construction engineering and management 138 (8), 931-942, 2012 | 33 | 2012 |