Fariborz Jolai
Fariborz Jolai
Department of Industrial Engineering, College of Engineering, University of Tehran
Verified email at ut.ac.ir
Title
Cited by
Cited by
Year
Approach by localization and multiobjective evolutionary optimization for flexible job-shop scheduling problems
I Kacem, S Hammadi, P Borne
IEEE Transactions on Systems, Man, and Cybernetics, Part C (Applications and …, 2002
8292002
Mathematical modeling and heuristic approaches to flexible job shop scheduling problems
P Fattahi, MS Mehrabad, F Jolai
Journal of intelligent manufacturing 18 (3), 331-342, 2007
3432007
A stochastic optimization model for integrated forward/reverse logistics network design
MS Pishvaee, F Jolai, J Razmi
Journal of Manufacturing Systems 28 (4), 107-114, 2009
3072009
Lion optimization algorithm (LOA): a nature-inspired metaheuristic algorithm
M Yazdani, F Jolai
Journal of computational design and engineering 3 (1), 24-36, 2016
2292016
A hybrid PSO algorithm for a multi-objective assembly line balancing problem with flexible operation times, sequence-dependent setup times and learning effect
N Hamta, SMTF Ghomi, F Jolai, MA Shirazi
International Journal of Production Economics 141 (1), 99-111, 2013
1712013
Robust and reliable forward–reverse logistics network design under demand uncertainty and facility disruptions
SM Hatefi, F Jolai
Applied Mathematical Modelling 38 (9-10), 2630-2647, 2014
1622014
Resource-constrained project management using enhanced theory of constraint
CC Wei, PH Liu, YC Tsai
International Journal of Project Management 20 (7), 561-567, 2002
1532002
A multi-objective scatter search for a mixed-model assembly line sequencing problem
AR Rahimi-Vahed, M Rabbani, R Tavakkoli-Moghaddam, SA Torabi, ...
Advanced Engineering Informatics 21 (1), 85-99, 2007
1372007
Integrating fuzzy TOPSIS and multi-period goal programming for purchasing multiple products from multiple suppliers
F Jolai, SA Yazdian, K Shahanaghi, MA Khojasteh
Journal of purchasing and Supply Management 17 (1), 42-53, 2011
1242011
A new heuristic for resource-constrained project scheduling in stochastic networks using critical chain concept
M Rabbani, SMTF Ghomi, F Jolai, NS Lahiji
European journal of operational research 176 (2), 794-808, 2007
1132007
A Simulated Annealing algorithm for a mixed model assembly U-line balancing type-I problem considering human efficiency and Just-In-Time approach
N Manavizadeh, N Hosseini, M Rabbani, F Jolai
Computers & Industrial Engineering 64 (2), 669-685, 2013
1072013
Flexible job shop scheduling with overlapping in operations
P Fattahi, F Jolai, J Arkat
Applied Mathematical Modelling 33 (7), 3076-3087, 2009
1052009
A variable neighborhood search for job shop scheduling with set-up times to minimize makespan
V Roshanaei, B Naderi, F Jolai, M Khalili
Future Generation Computer Systems 25 (6), 654-661, 2009
1042009
Efficient stochastic hybrid heuristics for the multi-depot vehicle routing problem
M Mirabi, SMTF Ghomi, F Jolai
Robotics and Computer-Integrated Manufacturing 26 (6), 564-569, 2010
982010
A hybrid method for solving stochastic job shop scheduling problems
R Tavakkoli-Moghaddam, F Jolai, F Vaziri, PK Ahmed, A Azaron
Applied mathematics and computation 170 (1), 185-206, 2005
962005
Minimizing mean flow times criteria on a single batch processing machine with non-identical jobs sizes
FJ Ghazvini, L Dupont
International Journal of Production Economics 55 (3), 273-280, 1998
961998
Integrated multi-site production-distribution planning in supply chain by hybrid modelling
AS Safaei, SM Moattar Husseini, R Z.-Farahani, F Jolai, SH Ghodsypour
International Journal of Production Research 48 (14), 4043-4069, 2010
942010
An M/M/c queue model for hub covering location problem
M Mohammadi, F Jolai, H Rostami
Mathematical and Computer Modelling 54 (11-12), 2623-2638, 2011
922011
A fuzzy stochastic multi-attribute group decision-making approach for selection problems
SM Mousavi, F Jolai, R Tavakkoli-Moghaddam
Group Decision and Negotiation 22 (2), 207-233, 2013
912013
Solving a new stochastic multi-mode p-hub covering location problem considering risk by a novel multi-objective algorithm
M Mohammadi, F Jolai, R Tavakkoli-Moghaddam
Applied Mathematical Modelling 37 (24), 10053-10073, 2013
862013
The system can't perform the operation now. Try again later.
Articles 1–20