An ordering policy for deteriorating items with allowable shortage and permissible delay in payment AMM Jamal, BR Sarker, S Wang Journal of the operational research society 48 (8), 826-833, 1997 | 877 | 1997 |
Supply chain models for perishable products under inflation and permissible delay in payment BR Sarker, AMM Jamal, S Wang Computers & Operations Research 27 (1), 59-75, 2000 | 446 | 2000 |
Optimal payment time for a retailer under permitted delay of payment by the wholesaler AMM Jamal, BR Sarker, S Wang International Journal of Production Economics 66 (1), 59-66, 2000 | 371 | 2000 |
Optimal manufacturing batch size with rework process at a single-stage production system AMM Jamal, BR Sarker, S Mondal Computers & industrial engineering 47 (1), 77-89, 2004 | 361 | 2004 |
An order-level lot size inventory model with inventory-level dependent demand and deterioration BR Sarker, S Mukherjee, CV Balan International Journal of Production Economics 48 (3), 227-236, 1997 | 226 | 1997 |
Minimizing maintenance cost for offshore wind turbines following multi-level opportunistic preventive strategy BR Sarker, TI Faiz Renewable energy 85, 104-113, 2016 | 219 | 2016 |
Optimal payment time under permissible delay in payment for products with deterioration BR Sarker, AMM Jamal, S Wang Production Planning & Control 11 (4), 380-390, 2000 | 217 | 2000 |
The performance of push and pull systems: a simulation and comparative study BR Sarker, JA Fitzsimmons The International Journal of Production Research 27 (10), 1715-1731, 1989 | 207 | 1989 |
Metaheuristics for project and construction management–A state-of-the-art review TW Liao, PJ Egbelu, BR Sarker, SS Leu Automation in construction 20 (5), 491-505, 2011 | 185 | 2011 |
Optimal batch sizing in a multi-stage production system with rework consideration BR Sarker, AMM Jamal, S Mondal European Journal of Operational Research 184 (3), 915-929, 2008 | 181 | 2008 |
A study of optimal allocation of computing resources in cloud manufacturing systems Y Laili, F Tao, L Zhang, BR Sarker The International Journal of Advanced Manufacturing Technology 63, 671-690, 2012 | 176 | 2012 |
An optimal batch size for a production system operating under a fixed-quantity, periodic delivery policy BR Sarker, GR Parija Journal of the Operational Research Society 45 (8), 891-900, 1994 | 162 | 1994 |
Improving performance by coordinating a supply chain with third party logistics outsourcing under production disruption BC Giri, BR Sarker Computers & Industrial Engineering 103, 168-177, 2017 | 157 | 2017 |
Travel time models in automated storage/retrieval systems: A critical review BR Sarker, PS Babu International Journal of Production Economics 40 (2-3), 173-184, 1995 | 155 | 1995 |
Optimal models for a multi-stage supply chain system controlled by kanban under just-in-time philosophy S Wang, BR Sarker European Journal of Operational Research 172 (1), 179-200, 2006 | 149 | 2006 |
Economic manufacturing quantity in a just-in-time delivery system DY Golhar, BR Sarker The International Journal of Production Research 30 (5), 961-972, 1992 | 146 | 1992 |
Effects of inflation and the time value of money on order quantity and allowable shortage BR Sarker, H Pan International Journal of Production Economics 34 (1), 65-72, 1994 | 143 | 1994 |
Coordinated contracts in a two-echelon green supply chain considering pricing strategy AA Taleizadeh, N Alizadeh-Basban, BR Sarker Computers & Industrial Engineering 124, 249-275, 2018 | 134 | 2018 |
A survey and critical review of flexibility measures in manufacturing systems BR Sarker, S Krishnamurthy, SG Kuthethur Production Planning & Control 5 (6), 512-523, 1994 | 122 | 1994 |
Manufacturing setup cost reduction under variable lead times and finite opportunities for investment BR Sarker, ER Coates International Journal of Production Economics 49 (3), 237-247, 1997 | 118 | 1997 |