Follow
Krzysztof Fleszar
Krzysztof Fleszar
Professor, American University of Beirut, Olayan School of Business
Verified email at aub.edu.lb - Homepage
Title
Cited by
Cited by
Year
A variable neighbourhood search algorithm for the open vehicle routing problem
K Fleszar, IH Osman, KS Hindi
European Journal of Operational Research 195 (3), 803-809, 2009
3122009
New heuristics for one-dimensional bin-packing
K Fleszar, KS Hindi
Computers & operations research 29 (7), 821-839, 2002
2842002
Solving the resource-constrained project scheduling problem by a variable neighbourhood search
K Fleszar, KS Hindi
European Journal of Operational Research 155 (2), 402-413, 2004
2542004
An evolutionary algorithm for resource-constrained project scheduling
KS Hindi, H Yang, K Fleszar
IEEE Transactions on Evolutionary Computation 6 (5), 512-518, 2002
1322002
An effective VNS for the capacitated p-median problem
K Fleszar, KS Hindi
European Journal of Operational Research 191 (3), 612-622, 2008
1272008
An enumerative heuristic and reduction methods for the assembly line balancing problem
K Fleszar, KS Hindi
European Journal of Operational Research 145 (3), 606-620, 2003
1272003
Average-weight-controlled bin-oriented heuristics for the one-dimensional bin-packing problem
K Fleszar, C Charalambous
European Journal of Operational Research 210 (2), 176-184, 2011
912011
An effective heuristic for the CLSP with set-up times
KS Hindi, K Fleszar, C Charalambous
Journal of the Operational Research Society 54 (5), 490-498, 2003
722003
Algorithms for the unrelated parallel machine scheduling problem with a resource constraint
K Fleszar, KS Hindi
European Journal of Operational Research 271 (3), 839-848, 2018
702018
A constructive bin-oriented heuristic for the two-dimensional bin packing problem with guillotine cuts
C Charalambous, K Fleszar
Computers & Operations Research 38 (10), 1443-1451, 2011
602011
Fast, effective heuristics for the 0–1 multi-dimensional knapsack problem
K Fleszar, KS Hindi
Computers & Operations Research 36 (5), 1602-1607, 2009
602009
Three insertion heuristics and a justification improvement heuristic for two-dimensional bin packing with guillotine cuts
K Fleszar
Computers & Operations Research 40 (1), 463-474, 2013
522013
A variable neighborhood descent heuristic for the problem of makespan minimisation on unrelated parallel machines with setup times
K Fleszar, C Charalambous, KS Hindi
Journal of Intelligent Manufacturing 23 (5), 1949-1958, 2012
512012
A constraint propagation heuristic for the single-hoist, multiple-products scheduling problem
KS Hindi, K Fleszar
Computers & Industrial Engineering 47 (1), 91-101, 2004
482004
A branch-and-bound algorithm for the quadratic multiple knapsack problem
K Fleszar
European Journal of Operational Research 298 (1), 89-98, 2022
272022
A new MILP model for the accessibility windows assembly line balancing problem level 2 (AWALBP-L2)
K Fleszar
European Journal of Operational Research 259 (1), 169-174, 2017
112017
An Exact Algorithm for the Two-Dimensional Stage-Unrestricted Guillotine Cutting/Packing Decision Problem
K Fleszar
INFORMS Journal on Computing 28 (4), 703-720, 2016
112016
Hybrid of the weighted minimum slack and shortest processing time dispatching rules for the total weighted tardiness single machine scheduling problem with availability constraints
I Osman, H Belouadah, K Fleszar, M Saffar
Multidisciplinary International Conference on Scheduling: Theory and …, 2009
102009
A MILP model and two heuristics for the bin packing problem with conflicts and item fragmentation
K Fleszar
European Journal of Operational Research 303 (1), 37-53, 2022
82022
A hybrid searching method for the unrelated parallel machine scheduling problem
C Charalambous, K Fleszar, KS Hindi
Artificial Intelligence Applications and Innovations: 6th IFIP WG 12.5 …, 2010
72010
The system can't perform the operation now. Try again later.
Articles 1–20