Follow
Hyeongon Park
Hyeongon Park
Korea Polytechnic University
Verified email at kpu.ac.kr
Title
Cited by
Cited by
Year
Stochastic security-constrained unit commitment with wind power generation based on dynamic line rating
H Park, YG Jin, JK Park
International Journal of Electrical Power & Energy Systems 102, 211-222, 2018
532018
Impact of carbon emission constraint on design of small scale multi-energy system
JH Yi, W Ko, JK Park, H Park
Energy 161, 792-808, 2018
352018
Unit commitment considering interruptible load for power system operation with wind power
HG Park, JK Lyu, YC Kang, JK Park
Energies 7 (7), 4281-4299, 2014
232014
A flexible ramping capacity model for generation scheduling with high levels of wind energy penetration
H Kwon, JK Park, D Kim, J Yi, H Park
Energies 9 (12), 1040, 2016
142016
Determining the interruptible load with strategic behavior in a competitive electricity market
TH Yoo, H Park, JK Lyu, JK Park
Energies 8 (1), 257-277, 2014
132014
Determining the flexible ramping capacity of electric vehicles to enhance locational flexibility
D Kim, H Kwon, MK Kim, JK Park, H Park
Energies 10 (12), 2028, 2017
102017
Cost analysis method for estimating dynamic reserve considering uncertainties in supply and demand
K Kwon, H Park, JK Lyu, JK Park
Energies 9 (10), 845, 2016
102016
Enhanced flexible ramping product formulation for alleviating capacity shortage in look-ahead commitment
H Park, B Huang, R Baldick
Journal of Modern Power Systems and Clean Energy 10 (4), 850-860, 2022
92022
A bi-level scheduling model of the distribution system with a distribution company and virtual power plants considering grid flexibility
H Park, W Ko
IEEE Access 10, 36711-36724, 2022
82022
Transmission investment and expansion planning for systems with high-temperature superconducting cables
JH Choi, H Park, R Baldick
IEEE Transactions on Applied Superconductivity 29 (8), 1-9, 2019
82019
Optimal microgrid scheduling to provide operational flexibility in main grid operation
H Park, SY Lee
Energy Reports 6, 172-176, 2020
52020
Enhanced ramping product design to improve power system reliability
H Park, B Huang, R Baldick
arXiv preprint arXiv:1905.01747, 2019
42019
Dynamic reserve estimating method with consideration of uncertainties in supply and demand
KB Kwon, HG Park, JK Lyu, YC Kim, JK Park
The Transactions of The Korean Institute of Electrical Engineers 62 (11 …, 2013
42013
Considering maintenance cost in unit commitment problems
H Park, J Park, JY Park, JH Heo
Energies 10 (11), 1917, 2017
32017
An investigation into the impact of limiting carbon emissions on the Korean power system and the electricity market
C Kim, H Park
Journal of Electrical Engineering and Technology 12 (3), 1038-1045, 2017
22017
Stochastic Security—Constrained Generation Scheduling with Wind Power Generation based on Dynamic Line Rating
박현곤
서울대학교 대학원, 2016
12016
벌크항만의 하역 최적화를 위한 정수계획모형
유태선, 이유신, 박현곤, 김도희, 배혜림
한국산업정보학회논문지 27 (6), 105-114, 2022
2022
분산전원 수용 확대를 위한 계통보강 및 출력 감발 간 경제성 분석
김현진, 조종민, 백자현, 박현곤, 황평익, 조성수
전기학회논문지 71 (9), 1211-1220, 2022
2022
Necessity of SPS for transient stability improvement when connecting large generating units: UAE nuclear power plant case: UAE nuclear power plant case
BH Kim, W Ko, H Park, JK Park, BW Cho
대한전기학회 학술대회 논문집, 180-181, 2017
2017
Small Signal Stability Analysis by PSSE/NEVA for a Power Plant Addition to Gulf Grid
BH Kim, H Park, W Ko, J Kim, JK Park
대한전기학회 학술대회 논문집, 194-195, 2016
2016
The system can't perform the operation now. Try again later.
Articles 1–20