Khaled El-Kilany
Khaled El-Kilany
Arab Academy for Science, Technology, and Maritime Transport
Verified email at aast.edu - Homepage
Title
Cited by
Cited by
Year
Value stream map simulator using ExtendSim
MA Shararah, KS El-Kilany, AE El-Sayed
Proceedings of the World Congress on Engineering 1, 2011
202011
Sustainable agri-food supply chain with uncertain demand and lead time
NM Galal, KS El-Kilany
International Journal of Simulation Modelling 15 (3), 485-496, 2016
192016
Modelling and simulation of re-entrant flow shop scheduling: An application in semiconductor manufacturing
IA El-Khouly, KS El-Kilany, AE El-Sayed
2009 International Conference on Computers & Industrial Engineering, 211-216, 2009
182009
Optimization using simulation of traffic light signal timings
AA Ezzat, HA Farouk, KS El-Kilany, AFA Moneim
Proceedings of the 2014 International Conference on Industrial Engineering …, 2014
152014
Process modeling and analysis of a quality management system for higher education
B El-Sharef, KS El-Kilany
Proceedings of the World Congress on Engineering 1, 6-8, 2011
142011
Component based modeling and simulation of value stream mapping for lean production systems
MA Shararah, KS El-Kilany, AE El-Sayed
FAIM Conference, 881-888, 2010
132010
Simulation of agri-food supply chains
S Beshara, KS El-Kilany, NM Galal
International Journal of Industrial and Manufacturing Engineering 6 (5), 899-904, 2012
122012
A genetic algorithm approach to the group technology problem
HH Sharif, KS El-Kilany, MA Helaly
Proceedings of the International MultiConference of Engineers and Computer …, 2008
102008
Optimization using simulation of the vehicle routing problem
NE El-Gharably, KS El-Kilany, AE El-Sayed
World Academy of Science, Engineering and Technology, International Journal …, 2013
92013
Development of a stochastic genetic algorithm for traffic signal timings optimization
AA Ezzat, HA Farouk, KS El-Kilany, AF Abdelmoneim
Proceedings of the 2014 Industrial and Systems Engineering Research …, 2014
82014
Effective scheduling of semiconductor manufacturing using simulation
IA El-Khouly, KS El-Kilany, AE El-Sayed
World Academy of Science, Engineering and Technology 5 (7), 211-230, 2011
82011
Generic tool for modelling and simulation of semiconductor intrabay material handling system
KS El-Kilany, P Young, MA El Baradie
Journal of materials processing technology 155, 1927-1934, 2004
82004
A simulation based continuous improvement approach for manufacturing based field repair service contracting
A Owida, PJ Byrne, C Heavey, P Blake, KS El-Kilany
International Journal of Production Research 54 (21), 6458-6477, 2016
72016
Energy-Based Aggregate Production Planning For Porcelain Tableware Manufacturer in Egypt
A Nour, NM Galal, KS El-Kilany
Proceedings of the International Conference on Industrial Engineering and …, 2017
62017
Reusable modelling and simulation of flexible manufacturing for next generation semiconductor Manufacturing facilities
KS El-Kilany
Dublin City School. School of Mechanical and Manufacturing Engineering, 2003
62003
An integrated framework for optimization of resources in emergency departments
J El-Zoghby, HA Farouk, KS El-Kilany
6th International Conference on Industrial Engineering and Operations …, 2016
42016
Wafer lot release policies based on the continuous and periodic review of WIP levels
KS El-Kilany
2011 IEEE International Conference on Industrial Engineering and Engineering …, 2011
42011
Process Design of Semiconductor Intrabay Amhs Using Simulation
KS El-Kilany, P Young
14th International CIRP Design Seminar, 2004
42004
Modeling stereolithography process parameters using system dynamics
L El-Sherif, M Ghazy, KS El-Kilany
Arab Academy for Science, Technology & Maritime Transport, 2015
32015
A simulation study of lot flow control in wafer fabrication facilities
IA El-Khouly, KS El-Kilany, P Young
The International Conference on Industrial Engineering and Operations …, 2012
32012
The system can't perform the operation now. Try again later.
Articles 1–20